Calibre Mining Corp CXBMF
News
Calibre’s Q1 Gold Production on Track to Deliver Full Year 2024 Guidance While Advancing Operational Readiness For H1, 2025 First Gold at The Fully Funded Valentine Gold Mine
Calibre’s Valentine Gold Mine Property-Wide Exploration Program Underway With Initial Drill Program Southwest of the Leprechaun Deposit Following Recent Discovery Drilling Including 46 g/t Gold Over 5.3 Metres
Calibre Enters Pre-Commissioning and Commissioning Contract with Reliable Controls Corporation and Executes A Gold Prepayment
Calibre Strengthens its Team with the Appointment of Vice President, Canadian Operations and Process Plant Manager for the Valentine Gold Mine; Additionally, Calibre Announces GDX Index Inclusion
Calibre Achieves Year 3 Compliance With the World Gold Council’s Responsible Gold Mining Principles
Calibre Delivers Fourth Consecutive Year of Mineral Reserve Growth
Calibre Announces Resignation of Director
Calibre Continues to Intersect Shallow Open Pit Mineable Grades and Widths at the Volcan Gold Deposit, located Approximately 5 Kilometres From the Libertad Mill; Drilling Intersects Include 15.01 g/t Gold over 2.6 metres and 6.37 g/t Gold over 3.3 metres
Calibre Intercepts High Grade Gold Mineralization at the Limon Mine Complex, Proximal to the Limon Processing Plant; Drilling Intersects Include 68.72 g/t Gold Over 2.0 Metres and 18.68 g/t Gold Over 6.0 Metres
Calibre Exceeds the High-End of 2023 Production Guidance, Increasing Gold Production in 2024 to 275,000 – 300,000 Ounces With Significant Future Growth Coming From the Multi-Million Ounce Valentine Gold Mine in Canada
Calibre’s Ore Control Drilling Intersects High-Grade Gold Outside of Reported Mineral Reserves Adding Additional Tonnes At The Valentine Gold Mine, Canada; Results Outside Mineral Reserves Include 46.53 g/t Gold Over 5.3 Metres and 17.16 g/t Gold Over 7.0 Metres
Calibre Reports Positive Drill Results One Kilometre Southwest of Valentine Gold Mine Resources Demonstrating Strong Discovery Potential Across the 32 Kilometre Shear Zone, Newfoundland & Labrador, Canada; Drilling Intersected 3.14 g/t Au Over 14.8 Metres
As Today’s Global Market Fluctuates with Uncertainty, Some Analysts Forecasting Upside in Times Ahead for Gold
Calibre Continues to Intercept Bonanza Grade Drill Results Along the Multi-Kilometre Panteon VTEM Gold Corridor at the Limon Mine Complex; Drilling Intersects Include 111.92 g/t Gold over 4.1 metres and 33.60 g/t Gold over 2.6 metres