| • FORM 10-Q • COMPUTATION OF RATIOS OF EARNINGS TO FIXED CHARGES • COMPUTATION OF RATIOS OF EARNINGS TO FIXED CHARGES • COMPUTATION OF RATIOS OF EARNINGS TO FIXED CHARGES • COMPUTATION OF RATIOS OF EARNINGS TO FIXED CHARGES • CERTIFICATION BY RALPH IZZO PURSUANT TO RULES 13A-14 AND 15D-14 OF THE 1934 ACT • CERTIFICATION BY CAROLINE DORSA PURSUANT TO RULES 13A-14 AND 15D-14 • CERTIFICATION BY RALPH IZZO PURSUANT TO RULES 13A-14 AND 15D-14 OF THE 1934 ACT • CERTIFICATION BY CAROLINE DORSA PURSUANT TO RULES 13A-14 AND 15D-14 • CERTIFICATION BY RALPH IZZO PURSUANT TO RULES 13A-14 AND 15D-14 OF THE 1934 ACT • CERTIFICATION BY CAROLINE DORSA PURSUANT TO RULES 13A-14 AND 15D-14 • CERTIFICATION BY RALPH IZZO PURSUANT TO SECTION 1350 OF CHAPTER 63 • CERTIFICATION BY CAROLINE DORSA PURSUANT TO SECTION 1350 OF CHAPTER 63 • CERTIFICATION BY RALPH IZZO PURSUANT TO SECTION 1350 OF CHAPTER 63 • CERTIFICATION BY CAROLINE DORSA PURSUANT TO SECTION 1350 OF CHAPTER 63 • CERTIFICATION BY RALPH IZZO PURSUANT TO SECTION 1350 OF CHAPTER 63 • CERTIFICATION BY CAROLINE DORSA PURSUANT TO SECTION 1350 OF CHAPTER 63 • XBRL INSTANCE DOCUMENT • XBRL TAXONOMY EXTENSION SCHEMA • XBRL TAXONOMY EXTENSION CALCULATION LINKBASE • XBRL TAXONOMY EXTENSION DEFINITION LINKBASE • XBRL TAXONOMY EXTENSION LABEL LINKBASE • XBRL TAXONOMY EXTENSION PRESENTATION LINKBASE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Table of Contents
UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549
FORM 10-Q (Mark One) x QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE QUARTERLY PERIOD ENDED June 30, 2012 OR ¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE TRANSITION PERIOD FROM TO
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days. Yes x No ¨ Indicate by check mark whether the registrants have submitted electronically and posted on their corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit and post such files).
Indicate by check mark whether each registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See definitions of large accelerated filer, accelerated filer and smaller reporting company in Rule 12b-2 of the Exchange Act.
Indicate by check mark whether any of the registrants is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No x As of July 17, 2012, Public Service Enterprise Group Incorporated had outstanding 505,935,372 shares of its sole class of Common Stock, without par value. As of July 17, 2012, Public Service Electric and Gas Company had issued and outstanding 132,450,344 shares of Common Stock, without nominal or par value, all of which were privately held, beneficially and of record by Public Service Enterprise Group Incorporated. PSEG Power LLC and Public Service Electric and Gas Company are wholly owned subsidiaries of Public Service Enterprise Group Incorporated and meet the conditions set forth in General Instruction H(1) (a) and (b) of Form 10-Q. Each is filing its Quarterly Report on Form 10-Q with the reduced disclosure format authorized by General Instruction H.
Table of Contents
i
Table of ContentsCertain of the matters discussed in this report constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements are subject to risks and uncertainties, which could cause actual results to differ materially from those anticipated. Such statements are based on managements beliefs as well as assumptions made by and information currently available to management. When used herein, the words anticipate, intend, estimate, believe, expect, plan, should, hypothetical, potential, forecast, project, variations of such words and similar expressions are intended to identify forward-looking statements. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Other factors that could cause actual results to differ materially from those contemplated in any forward-looking statements made by us herein are discussed in Item 1. Financial StatementsNote 8. Commitments and Contingent Liabilities, Item 2. Managements Discussion and Analysis of Financial Condition and Results of Operations, and other factors discussed in filings we make with the United States Securities and Exchange Commission (SEC). These factors include, but are not limited to:
All of the forward-looking statements made in this report are qualified by these cautionary statements and we cannot assure you that the results or developments anticipated by management will be realized or even if realized, will have the expected consequences to, or effects on, us or our business prospects, financial condition or results of operations. Readers are cautioned not to place undue reliance on these forward-looking statements in making any investment decision. Forward-looking statements made in this report apply only as of the date of this report. While we may elect to update forward-looking statements from time to time, we specifically disclaim any obligation to do so, even if internal estimates change, unless otherwise required by applicable securities laws. The forward-looking statements contained in this report are intended to qualify for the safe harbor provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended.
ii
Table of ContentsPUBLIC SERVICE ENTERPRISE GROUP INCORPORATED CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS Millions (Unaudited)
See Notes to Condensed Consolidated Financial Statements.
1
Table of ContentsPUBLIC SERVICE ENTERPRISE GROUP INCORPORATED CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME Millions (Unaudited)
See Notes to Condensed Consolidated Financial Statements.
2
Table of ContentsPUBLIC SERVICE ENTERPRISE GROUP INCORPORATED CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See Notes to Condensed Consolidated Financial Statements.
3
Table of ContentsPUBLIC SERVICE ENTERPRISE GROUP INCORPORATED CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See Notes to Condensed Consolidated Financial Statements.
4
Table of ContentsPUBLIC SERVICE ENTERPRISE GROUP INCORPORATED CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS Millions (Unaudited)
See Notes to Condensed Consolidated Financial Statements.
5
Table of ContentsCONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS Millions (Unaudited)
See disclosures regarding PSEG Power LLC included in the Notes to Condensed Consolidated Financial Statements.
6
Table of ContentsPSEG POWER LLC CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME Millions (Unaudited)
See disclosures regarding PSEG Power LLC included in the Notes to Condensed Consolidated Financial Statements.
7
Table of ContentsPSEG POWER LLC CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See disclosures regarding PSEG Power LLC included in the Notes to Condensed Consolidated Financial Statements.
8
Table of ContentsPSEG POWER LLC CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See disclosures regarding PSEG Power LLC included in the Notes to Condensed Consolidated Financial Statements.
9
Table of ContentsPSEG POWER LLC CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS Millions (Unaudited)
See disclosures regarding PSEG Power LLC included in the Notes to the Condensed Consolidated Financial Statements.
10
Table of ContentsPUBLIC SERVICE ELECTRIC AND GAS COMPANY CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS Millions (Unaudited)
See disclosures regarding Public Service Electric and Gas Company included in the Notes to Condensed Consolidated Financial Statements.
11
Table of ContentsPUBLIC SERVICE ELECTRIC AND GAS COMPANY CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME Millions (Unaudited)
See disclosures regarding Public Service Electric and Gas Company included in the Notes to Condensed Consolidated Financial Statements.
12
Table of ContentsPUBLIC SERVICE ELECTRIC AND GAS COMPANY CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See disclosures regarding Public Service Electric and Gas Company included in the Notes to Condensed Consolidated Financial Statements.
13
Table of ContentsPUBLIC SERVICE ELECTRIC AND GAS COMPANY CONDENSED CONSOLIDATED BALANCE SHEETS Millions (Unaudited)
See disclosures regarding Public Service Electric and Gas Company included in the Notes to Condensed Consolidated Financial Statements.
14
Table of ContentsPUBLIC SERVICE ELECTRIC AND GAS COMPANY CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS Millions (Unaudited)
See disclosures regarding Public Service Electric and Gas Company included in the Notes to Condensed Consolidated Financial Statements.
15
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED) This combined Form 10-Q is separately filed by Public Service Enterprise Group Incorporated (PSEG), PSEG Power LLC (Power) and Public Service Electric and Gas Company (PSE&G). Information relating to any individual company is filed by such company on its own behalf. Power and PSE&G each is only responsible for information about itself and its subsidiaries. Note 1. Organization and Basis of Presentation Organization PSEG is a holding company with a diversified business mix within the energy industry. Its operations are primarily in the Northeastern and Mid Atlantic United States and in other select markets. PSEGs four principal direct wholly owned subsidiaries are:
Basis of Presentation The respective financial statements included herein have been prepared pursuant to the rules and regulations of the Securities and Exchange Commission (SEC) applicable to Quarterly Reports on Form 10-Q. Certain information and note disclosures normally included in financial statements prepared in accordance with accounting principles generally accepted in the United States (GAAP) have been condensed or omitted pursuant to such rules and regulations. These Condensed Consolidated Financial Statements and Notes to Condensed Consolidated Financial Statements (Notes) should be read in conjunction with, and update and supplement matters discussed in, the Annual Report on Form 10-K for the year ended December 31, 2011 and Quarterly Report on Form 10-Q for the quarter ended March 31, 2012. The unaudited condensed consolidated financial information furnished herein reflects all adjustments which are, in the opinion of management, necessary to fairly state the results for the interim periods presented. All such adjustments are of a normal recurring nature. All significant intercompany accounts and transactions are eliminated in consolidation, except as discussed in Note 17. Related-Party Transactions. The year-end Condensed Consolidated Balance Sheets were derived from the audited Consolidated Financial Statements included in the Annual Report on Form 10-K for the year ended December 31, 2011.
16
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Note 2. Recent Accounting Standards New Standards Adopted during 2012 Amendments to Achieve Common Fair Value Measurement and Disclosure Requirements in GAAP and International Financial Reporting Standards (IFRS) This accounting standard was issued to update guidance related to fair value measurements and disclosures as a step towards achieving convergence between GAAP and IFRS. The updated guidance
We adopted this standard prospectively effective January 1, 2012. Upon adoption there was no material impact on our consolidated financial position, results of operations or cash flows; however, it has resulted in expanded disclosures. For additional information, see Note 11. Fair Value Measurements. Presentation of Comprehensive Income This accounting standard addresses the presentation of comprehensive income as a step towards achieving convergence between GAAP and IFRS. The updated guidance
In December 2011, the FASB issued an amendment to this standard to indefinitely defer the effective date for some of the specific disclosure requirements that relate to the presentation of reclassification adjustments out of accumulated other comprehensive income by component in both the statement in which net income is presented and the statement in which other comprehensive income is presented. During the deferral period, the existing requirements in GAAP for the presentation of reclassification adjustments must continue to be followed. We adopted this standard retrospectively effective January 1, 2012. Upon adoption of the new amended guidance, there was no impact on our consolidated financial position, results of operations or cash flows, but there was a change in the presentation of the components of other comprehensive income. New Accounting Standards Issued But Not Yet Adopted Disclosures about Offsetting Assets and Liabilities This accounting standard was issued on balance sheet offsetting disclosures to facilitate comparability between financial statements prepared on the basis of GAAP and IFRS. This standard requires entities:
The guidance is effective for fiscal years and interim periods beginning on or after January 1, 2013. As this standard requires disclosures only, it will not have any impact on our consolidated financial position, results of operations or cash flows upon adoption.
17
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Note 3. Variable Interest Entities (VIEs) Variable Interest Entities for which PSE&G is the Primary Beneficiary PSE&G is the primary beneficiary and consolidates two marginally capitalized VIEs, PSE&G Transition Funding LLC (Transition Funding) and PSE&G Transition Funding II LLC (Transition Funding II), which were created for the purpose of issuing transition bonds and purchasing bond transitional property of PSE&G, which is pledged as collateral to a trustee. PSE&G acts as the servicer for these entities to collect securitization transition charges authorized by the BPU. These funds are remitted to Transition Funding and Transition Funding II and are used for interest and principal payments on the transition bonds and related costs. The assets and liabilities of these VIEs are presented separately on the face of the Condensed Consolidated Balance Sheets of PSEG and PSE&G because the Transition Funding and Transition Funding II assets are restricted and can only be used to settle their respective obligations. No Transition Funding or Transition Funding II creditor has any recourse to the general credit of PSE&G in the event the transition charges are not sufficient to cover the bond principal and interest payments of Transition Funding or Transition Funding II, respectively. PSE&Gs maximum exposure to loss is equal to its equity investment in these VIEs which was $16 million as of June 30, 2012 and December 31, 2011. The risk of actual loss to PSE&G is considered remote. PSE&G did not provide any financial support to Transition Funding or Transition Funding II during the first half of 2012 or in 2011. Further, PSE&G does not have any contractual commitments or obligations to provide financial support to Transition Funding or Transition Funding II. Note 4. Discontinued Operations and Dispositions Discontinued Operations Power In March 2011, Power completed the sale of its 1,000 MW gas-fired Guadalupe generating facility for a total price of $352 million, resulting in an after-tax gain of $54 million. In July 2011, Power completed the sale of its 1,000 MW gas-fired Odessa generating facility for approximately $335 million, resulting in an after-tax gain of approximately $25 million. PSEG Texas operating results for the three months and six months ended June 30, 2011, which were reclassified to Discontinued Operations, are summarized below:
18
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
PSE&G PSE&G sponsors a solar loan program designed to help finance the installation of solar power systems throughout its electric service area. The loans are generally paid back with Solar Renewable Energy Certificates (SRECs) generated from the installed solar electric system. The following table reflects the outstanding short and long-term loans by class of customer, none of which are considered non-performing.
Energy Holdings Energy Holdings has investments in domestic energy and real estate assets subject primarily to leveraged lease accounting. A leveraged lease is typically comprised of an investment by an equity investor and debt provided by a third party debt investor. The debt is recourse only to the assets subject to lease and is not included on PSEGs Condensed Consolidated Balance Sheets. As an equity investor, Energy Holdings investments in the leases are comprised of the total expected lease receivables on its investments over the lease terms plus the estimated residual values at the end of the lease terms, reduced for any income not yet earned on the leases. This amount is included in Long-Term Investments on PSEGs Condensed Consolidated Balance Sheets. The more rapid depreciation of the leased property for tax purposes creates tax cash flow that will be repaid to the taxing authority in later periods. As such, the liability for such taxes due is recorded in Deferred Income Taxes on PSEGs Condensed Consolidated Balance Sheets. The table below shows Energy Holdings gross and net lease investment as of June 30, 2012 and December 31, 2011, respectively.
19
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The corresponding receivables associated with the lease portfolio are reflected below, net of non-recourse debt. The ratings in the table represent the ratings of the entities providing payment assurance to Energy Holdings. Not Rated counterparties relate to investments in leases of commercial real estate properties.
The B- and CCC ratings above represent lease receivables related to coal-fired assets in Illinois and Pennsylvania. As of June 30, 2012, the gross investment in the leases of such assets, net of non-recourse debt, was $553 million ($57 million, net of deferred taxes). A more detailed description of such assets under lease is presented in the table below.
Although all lease payments are current, no assurances can be given that future payments in accordance with the lease contracts will continue. Factors which may impact future lease cash flows include, but are not limited to, new environmental legislation and regulation regarding air quality, water and other discharges in the process of generating electricity, market prices for fuel and electricity, overall financial condition of lease counterparties and the quality and condition of assets under lease. Of our facilities under lease to GenOn REMA, LLC (GenOn REMA), a subsidiary of GenOn Energy Inc (GenOn), PSEG believes Keystone has adequate environmental controls installed. Conemaugh has flue gas desulfurization control. Selective catalytic reduction (SCR) equipment for Nitrogen Oxide and mercury control are scheduled to be installed at Conemaugh in 2014. GenOns plan for the coal-fired units at the Shawville facility is to place them in a long-term protective layup by April 2015; however, GenOn has indicated that it will continue paying the required rent and maintaining the facility in accordance with the lease terms. GenOn has further stated that the lessee is
20
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
evaluating its options under the lease, including termination for obsolescence or continuing to keep the facility in long-term protective layup. In the event that the lessee is able to terminate for obsolescence, the lessee would be required, among other things, to pay the contractual termination value structured to recover Energy Holdings lease investment as specified in the lease agreement. On July 22, 2012, GenOn announced that it has signed a definitive agreement to merge with NRG Energy, Inc. We are carefully monitoring these developments. With respect to Edison Mission Energys (EME) Midwest Generation leases on the Powerton and Joliet coal units in Illinois, the lessees completed investments in mercury removal (Activated Carbon Injection), low NOx burners and Selective Non-Catalytic Reduction systems and plan to employ a dry sorbent (Trona) system to reduce sulfur. EME and these units remain in litigation with the United States Environmental Protection Agency (EPA) and the State of Illinois regarding certain environmental matters; however EME has announced that the above actions should enable compliance with pending environmental rules. The federal district court has dismissed new source review claims in reference to Powerton and Joliet, but certain opacity claims remain active and under appeal by the EPA and the State of Illinois. The federal district court has stayed proceedings in connection with the opacity claims until the appeal is resolved. In its most recent quarterly report filed on July 31, 2012, EMEs parent, Edison International, reported that it will no longer provide financial support to EME, that Midwest Generation is largely dependent upon EME for its funding, that based upon current projections EME will not be able to meet its debt obligation in June 2013, and that failing a restructuring of its obligations, EME and Midwest Generation may need to file for protection under Chapter 11 of the Bankruptcy Code, which could have an impact on the Powerton and Joliet leases. The credit exposure for lessors is partially mitigated through various credit enhancement mechanisms within the lease transactions. These credit enhancement features vary from lease to lease. Some of the leasing transactions include covenants that restrict the flow of dividends from the lessee to its parent, collateralization of the lessee with non-leased assets, historical and forward cash flow coverage tests that prohibit discretionary capital expenditures and dividend payments to the parent/lessee if stated minimum coverage ratios are not met. These covenants are designed to maintain cash reserves in the transaction entity for the benefit of the non-recourse lenders and the lessor/equity participants in the event of a temporary market downturn or degradation in operating performance of the leased assets. In the event of a default in any of the lease transactions, Energy Holdings would exercise its rights and attempt to seek recovery of its investment. The results of such efforts may not be known for a period of time. A bankruptcy of a lessee and failure to recover adequate value could lead to a foreclosure on the lease by the lenders. If foreclosures were to occur, Energy Holdings could potentially record a pre-tax write-off up to its gross investment in these facilities and may also be required to pay significant cash tax liabilities. On December 13, 2011, affiliates of Energy Holdings and Dynegy reached a settlement agreement resolving disputes that had arisen between them with regard to Dynegy Holdings (DH) rejection of the Dynegy leases. The settlement agreement resolves certain disputes regarding the Dynegy leases, including claims under our Tax Indemnity Agreement with DH. The original terms of the settlement agreement included a cash payment of $7.5 million, which was received on January 4, 2012, and the Bankruptcy Courts allowance of a $110 million claim against DH. On June 1, 2012, an amended and restated settlement agreement entered into by DH, Dynegy and their creditors was approved by the Bankruptcy Court and became effective on June 5, 2012. As part of that settlement, Energy Holdings, DH and the creditors of DH agreed to commence a process to sell the Roseton and Danskammer facilities; the agreement allocates proceeds from the sale of the facilities to pay DHs creditors, including the lease bondholders, and grants the lease bondholders claims in agreed upon amounts against DH in its bankruptcy proceedings. The settlement agreement also includes an exchange of releases by various settling claimants, including parties to the leases with respect to claims arising out of the leases. Concurrently with the entry into the settlement agreement, DH filed an amended plan of reorganization, which is supported by the various settling claimants, providing that we and other unsecured creditors of DH will be paid our claims partially in cash and partially in stock in a reorganized Dynegy that will emerge at the conclusion of the bankruptcy. On July 3, 2012, the Bankruptcy Court approved DHs disclosure statement
21
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
describing its amended plan of reorganization; that disclosure statement is now being used in the formal solicitation of creditor votes on DHs amended plan. The Bankruptcy Court will receive the results of the balloting by creditors and conduct a hearing on approval of DHs amended plan on September 5, 2012. On December 30, 2011, the effective date of the court order authorizing the Dynegy lease rejections, the leases no longer qualified for leveraged lease accounting treatment under GAAP since the lease agreements were effectively terminated. As a result, Energy Holdings wrote off the $264 million gross lease investment against the previously recorded reserve. As the owner of the two plants, Energy Holdings lessor entities ceased leveraged lease accounting, and recorded the generation assets and related nonrecourse project debt on their balance sheets at their respective fair values (See Note 11. Fair Value Measurements). DH remains responsible for the operations, including the financial obligations, of these lessor entities. As of the June 5, 2012 effective date of the amended settlement agreement, the lease debt and the related assets were written off. Note 6. Available-for-Sale Securities Nuclear Decommissioning Trust (NDT) Fund Power maintains an external master nuclear decommissioning trust to fund its share of decommissioning for its five nuclear facilities upon termination of operation. The trust contains two separate funds: a qualified fund and a non-qualified fund. Section 468A of the Internal Revenue Code limits the amount of money that can be contributed into a qualified fund. The trust funds are managed by third party investment advisors who operate under investment guidelines developed by Power. Power classifies investments in the NDT Fund as available-for-sale. The following tables show the fair values and gross unrealized gains and losses for the securities held in the NDT Fund:
22
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
These amounts do not include receivables and payables for NDT Fund transactions which have not settled at the end of each period. Such amounts are included in Accounts Receivable and Accounts Payable on the Condensed Consolidated Balance Sheets as shown in the following table.
The following table shows the value of securities in the NDT Fund that have been in an unrealized loss position for less than and greater than 12 months. Power does not consider these securities to be other-than-temporarily impaired as of June 30, 2012.
23
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The proceeds from the sales of and the net realized gains on securities in the NDT Fund were:
Net realized gains disclosed in the above table were recognized in Other Income and Other Deductions in PSEGs and Powers Condensed Consolidated Statements of Operations. Net unrealized gains of $88 million (after-tax) were recognized in Accumulated Other Comprehensive Loss on Powers Condensed Consolidated Balance Sheet as of June 30, 2012. The NDT available-for-sale debt securities held as of June 30, 2012 had the following maturities:
The cost of these securities was determined on the basis of specific identification. Power periodically assesses individual securities whose fair value is less than amortized cost to determine whether the investments are considered to be other-than-temporarily impaired. For equity securities, management considers the ability and intent to hold for a reasonable time to permit recovery in addition to the severity and duration of the loss. For fixed income securities, management considers its intent to sell or requirement to sell a security prior to expected recovery. In those cases where a sale is expected, any impairment would be recorded through earnings. For fixed income securities where there is no intent to sell or likely requirement to sell, management evaluates whether credit loss is a component of the impairment. If so, that portion is recorded through earnings while the noncredit loss component is recorded through Accumulated Other Comprehensive Income (Loss). In 2012, other-than-temporary impairments of $12 million were recognized on securities in the NDT Fund. Any subsequent recoveries in the value of these securities would be recognized in Accumulated Other Comprehensive Income (Loss) unless the securities are sold, in which case, any gain would be recognized in income. The assessment of fair market value compared to cost is applied on a weighted average basis taking into account various purchase dates and initial cost of the securities. Rabbi Trust PSEG maintains certain unfunded nonqualified benefit plans to provide supplemental retirement and deferred compensation benefits to certain key employees. Certain assets related to these plans have been set aside in a grantor trust commonly known as the Rabbi Trust. In March 2012, PSEG restructured the fixed income component of the Rabbi Trust.
24
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
PSEG classifies investments in the Rabbi Trust as available-for-sale. The following tables show the fair values, gross unrealized gains and losses and amortized cost basis for the securities held in the Rabbi Trust.
As of June 30, 2012, amounts in the above table do not include Accounts Receivable of $1 million and Accounts Payable of $2 million for Rabbi Trust Fund transactions which had not yet settled. These amounts are included on the Condensed Consolidated Balance Sheets.
25
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Gross realized gains disclosed in the above table were recognized in Other Income in the Condensed Consolidated Statements of Operations. Net unrealized gains of $4 million (after-tax) were recognized in Accumulated Other Comprehensive Loss on the Condensed Consolidated Balance Sheets as of June 30, 2012. The Rabbi Trust available-for-sale debt securities held as of June 30, 2012 had the following maturities:
PSEG periodically assesses individual securities whose fair value is less than amortized cost to determine whether the investments are considered to be other-than-temporarily impaired. For equity securities, the Rabbi Trust is invested in a commingled indexed mutual fund. Due to the commingled nature of this fund, PSEG does not have the ability to hold these securities until expected recovery. As a result, any declines in fair market value below cost are recorded as a charge to earnings. For fixed income securities, management considers its intent to sell or requirement to sell a security prior to expected recovery. In those cases where a sale is expected, any impairment would be recorded through earnings. For fixed income securities where there is no intent to sell or likely requirement to sell, management evaluates whether credit loss is a component of the impairment. If so, that portion is recorded through earnings while the noncredit loss component is recorded through Accumulated Other Comprehensive Income (Loss). The assessment of fair market value compared to cost is applied on a weighted average basis taking into account various purchase dates and initial cost of the securities. The cost of these securities was determined on the basis of specific identification. The fair value of assets in the Rabbi Trust related to PSEG, Power and PSE&G are detailed as follows:
26
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
PSEG sponsors several qualified and nonqualified pension plans and OPEB plans covering PSEGs and its participating affiliates current and former employees who meet certain eligibility criteria. The following table provides the components of net periodic benefit costs relating to all qualified and nonqualified pension and OPEB plans on an aggregate basis. OPEB costs are presented net of the federal subsidy expected for prescription drugs under the Medicare Prescription Drug Improvement and Modernization Act of 2003. New federal health care legislation enacted in March 2010 eliminates the tax deductibility of retiree health care costs beginning in 2013, to the extent of federal subsidies received by plan sponsors that provide retiree prescription drug benefits equivalent to Medicare Part D coverage. See Note 13. Income Taxes for additional information. Pension and OPEB costs for PSEG are detailed as follows:
Pension and OPEB costs for Power, PSE&G and PSEGs other subsidiaries are detailed as follows:
During the three months ended March 31, 2012, PSEG contributed its entire planned contribution for the year 2012 of $124 million and $11 million into its pension and postretirement healthcare plans, respectively.
27
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Note 8. Commitments and Contingent Liabilities Guaranteed Obligations Powers activities primarily involve the purchase and sale of energy and related products under transportation, physical, financial and forward contracts at fixed and variable prices. These transactions are with numerous counterparties and brokers that may require cash, cash-related instruments or guarantees. Power has unconditionally guaranteed payments to counterparties by its subsidiaries in commodity-related transactions in order to
Under these agreements, guarantees cover lines of credit between entities and are often reciprocal in nature. The exposure between counterparties can move in either direction. In order for Power to incur a liability for the face value of the outstanding guarantees, its subsidiaries would have to
Power believes the probability of this result is unlikely. For this reason, Power believes that the current exposure at any point in time is a more meaningful representation of the potential liability under these guarantees. This current exposure consists of the net of accounts receivable and accounts payable and the forward value on open positions, less any collateral posted. Power is subject to
Changes in commodity prices can have a material impact on collateral requirements under such contracts, which are posted and received primarily in the form of cash and letters of credit. Power also routinely enters into futures and options transactions for electricity and natural gas as part of its operations. These futures contracts usually require a cash margin deposit with brokers, which can change based on market movement and in accordance with exchange rules. In addition to the guarantees discussed above, Power has also provided payment guarantees to third parties on behalf of its affiliated companies. These guarantees support various other non-commodity related contractual obligations.
28
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The face value of outstanding guarantees, current exposure and margin positions as of June 30, 2012 and December 31, 2011 are shown below:
As part of determining credit exposure, Power nets receivables and payables with the corresponding net energy contract balances. See Note 10. Financial Risk Management Activities for further discussion. In accordance with our accounting policy, where it is applicable, cash (received)/deposited is allocated against derivative asset and liability positions with the same counterparty on the face of the Balance Sheet. The remaining balances of net cash (received)/deposited after allocation are generally included in Accounts Payable and Receivable, respectively. In the event of a deterioration of Powers credit rating to below investment grade, which would represent a two level downgrade from its current S&P ratings or a three level downgrade from its current Moodys and Fitch ratings, many of these agreements allow the counterparty to demand further performance assurance. See table above. In addition, during 2012, the SEC and the Commodity Futures Trading Commission (CFTC) are continuing efforts to implement new rules to enact stricter regulation over swaps and derivatives. The CFTC issued a Final Rule regarding the definition of a swap dealer in May 2012 but the CFTC has yet to publish the Final Rule regarding the definition of a swap. In July 2012, the CFTC held a public meeting on the definition of a swap as well as the end-user exemption. Power will carefully monitor these new rules as they are developed to analyze the potential impact on its swap and derivatives transactions, including any potential increase to collateral requirements. In addition to amounts for outstanding guarantees, current exposure and margin positions, Power had posted letters of credit to support various other non-energy contractual and environmental obligations. See table above. Environmental Matters Passaic River Historic operations of PSEG companies and the operations of hundreds of other companies along the Passaic and Hackensack Rivers are alleged by federal and state agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex.
29
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) The EPA has determined that an eight-mile stretch of the Passaic River in the area of Newark, New Jersey is a facility within the meaning of that term under CERCLA. The EPA has determined the need to perform a study of the entire 17-mile tidal reach of the lower Passaic River. PSE&G and certain of its predecessors conducted operations at properties in this area on or adjacent to the Passaic River. The properties included one operating electric generating station (Essex Site), which was transferred to Power, one former generating station and four former manufactured gas plant (MGP) sites. When the Essex Site was transferred from PSE&G to Power, PSE&G obtained releases and indemnities for liabilities arising out of the former Essex generating station and Power assumed any environmental liabilities. The EPA believes that certain hazardous substances were released from the Essex Site and one of PSE&Gs former MGP locations (Harrison Site). In 2006, the EPA notified the potentially responsible parties (PRPs) that the cost of its study would greatly exceed the original estimated cost of $20 million. The total cost of the study is now estimated at approximately $105 million. 73 PRPs, including Power and PSE&G, agreed to assume responsibility for the study and formed the Cooperating Parties Group (CPG) to divide the associated costs according to a mutually agreed upon formula. The CPG group, currently 70 members, is presently executing the study. Approximately five percent of the study costs are attributable to PSE&Gs former MGP sites and approximately one percent to Powers generating stations. Power has provided notice to insurers concerning this potential claim. In 2007, the EPA released a draft Focused Feasibility Study (FFS) that proposed six options to address the contamination cleanup of the lower eight miles of the Passaic River. The EPA estimated costs for the proposed remedy range from $1.3 billion to $3.7 billion. The work contemplated by the study is not subject to the cost sharing agreement discussed above. The EPA is conducting a revised focused feasibility study which may be released as early as the fourth quarter of 2012. In June 2008, an agreement was announced between the EPA and Tierra Solutions, Inc. and Maxus Energy Corporation (Tierra/Maxus) for removal of a portion of the contaminated sediment in the Passaic River at an estimated cost of $80 million. That removal work is underway. Tierra/Maxus have reserved their rights to seek contribution for the removal costs from the other PRPs, including Power and PSE&G. The EPA has advised that the levels of contaminants at Passaic River mile 10.9 may require a pilot study and will require removal in advance of the completion of the Remedial Investigation and Feasibility Study or the issuance of a revised draft FFS. The CPG members, with the exception of Tierra/Maxus, have agreed to fund the 10.9 pilot study and removal currently estimated at approximately $30 million. PSEGs share of that effort is approximately three percent. Power and PSE&G are unable to estimate their portion of the possible loss or range of loss related to these matters. New Jersey Spill Compensation and Control Act (Spill Act) In 2005, the New Jersey Department of Environmental Protection (NJDEP) filed suit against a PRP and its related companies in the New Jersey Superior Court seeking damages and reimbursement for costs expended by the State of New Jersey to address the effects of the PRPs discharge of hazardous substances into both the Passaic River and the balance of the Newark Bay Complex. Power and PSE&G are alleged to have owned, operated or contributed hazardous substances to a total of 11 sites or facilities that impacted these water bodies. In February 2009, third party complaints were filed against some 320 third party defendants, including Power and PSE&G, claiming that each of the third party defendants is responsible for its proportionate share of the clean-up costs for the hazardous substances they allegedly discharged into the Passaic River and the Newark Bay Complex. The third party complaints seek statutory contribution and contribution under the Spill Act to recover past and future removal costs and damages. Power and PSE&G filed answers to the complaint in June 2010. A special master for discovery has been appointed by the court and document production has
30
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
commenced. Power and PSE&G believe they have good and valid defenses to the allegations contained in the third party complaints and will vigorously assert those defenses. Power and PSE&G are unable to estimate their portion of the possible loss or range of loss related to this matter. Natural Resource Damage Claims In 2003, the NJDEP directed PSEG, PSE&G and 56 other PRPs to arrange for a natural resource damage assessment and interim compensatory restoration of natural resource injuries along the lower Passaic River and its tributaries pursuant to the Spill Act. The NJDEP alleged that hazardous substances had been discharged from the Essex Site and the Harrison Site. The NJDEP estimated the cost of interim natural resource injury restoration activities along the lower Passaic River at approximately $950 million. In 2007, agencies of the United States Department of Commerce and the United States Department of the Interior sent letters to PSE&G and other PRPs inviting participation in an assessment of injuries to natural resources that the agencies intended to perform. In 2008, PSEG and a number of other PRPs agreed to share certain immaterial costs the trustees have incurred and will incur going forward, and to work with the trustees to explore whether some or all of the trustees claims can be resolved in a cooperative fashion. That effort is continuing. PSE&G is unable to estimate its portion of the possible loss or range of loss related to this matter. Newark Bay Study Area The EPA has established the Newark Bay Study Area, which it defines as Newark Bay and portions of the Hackensack River, the Arthur Kill and the Kill Van Kull. In August 2006, the EPA sent PSEG and 11 other entities notices that it considered each of the entities to be a PRP with respect to contamination in the Study Area. The notice letter requested that the PRPs fund an EPA-approved study in the Newark Bay Study Area and encouraged the PRPs to contact Occidental Chemical Corporation (OCC) to discuss participating in the Remedial Investigation/Feasibility Study that OCC was conducting. The notice stated the EPAs belief that hazardous substances were released from sites owned by PSEG companies and located on the Hackensack River, including two operating electric generating stations (Hudson and Kearny sites) and one former MGP site. PSEG has participated in and partially funded the second phase of this study. Notices to fund the next phase of the study have been received but it is uncertain at this time whether the PSEG companies will consent to fund the third phase. Power and PSE&G are unable to estimate their portion of the possible loss or range of loss related to this matter. MGP Remediation Program PSE&G is working with the NJDEP to assess, investigate and remediate environmental conditions at its former MGP sites. To date, 38 sites requiring some level of remedial action have been identified. Based on its current studies, PSE&G has determined that the estimated cost to remediate all MGP sites to completion could range between $616 million and $714 million through 2021. Since no amount within the range is considered to be most likely, PSE&G has recorded a liability of $616 million as of June 30, 2012. Of this amount, $90 million was recorded in Other Current Liabilities and $526 million was reflected as Environmental Costs in Noncurrent Liabilities. PSE&G has recorded a $616 million Regulatory Asset with respect to these costs. PSE&G periodically updates its studies taking into account any new regulations or new information which could impact future remediation costs and adjusts its recorded liability accordingly. Prevention of Significant Deterioration (PSD)/New Source Review (NSR) The PSD/NSR regulations, promulgated under the Clean Air Act, require major sources of certain air pollutants to obtain permits, install pollution control technology and obtain offsets, in some circumstances, when those sources undergo a major modification, as defined in the regulations. The federal government may order companies that are not in compliance with the PSD/NSR regulations to install the best available control technology at the affected plants and to pay monetary penalties ranging from $25,000 to $37,500 per day for each violation, depending upon when the alleged violation occurred.
31
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
In 2009, the EPA issued a notice of violation to Power and the other owners of the Keystone coal fired plant in Pennsylvania, alleging, among other things, that various capital improvement projects were completed at the plant which are considered modifications (or major modifications) causing significant net emission increases of PSD/NSR air pollutants, beginning in 1985 for Keystone Unit 1 and in 1984 for Keystone Unit 2. The notice of violation states that none of these modifications underwent PSD/NSR permitting process prior to being put into service, which the EPA alleges was required under the Clean Air Act. The notice of violation states that the EPA may issue an order requiring compliance with the relevant Clean Air Act provisions and may seek injunctive relief and/or civil penalties. Power owns approximately 23% of the plant. Power cannot predict the outcome of this matter. Hazardous Air Pollutants Regulation In accordance with a court ruling, the EPA published a Maximum Achievable Control Technology (MACT) regulation in the Federal Register on February 16, 2012. These Mercury Air Toxics Standards (MATS) go into effect on April 16, 2015 and establish allowable emission levels for mercury as well as other hazardous air pollutants pursuant to the Clean Air Act. On March 19, 2012, PSEG filed a motion to intervene in support of the EPAs implementation of MATS. The back-end technology environmental controls recently installed at Powers Hudson and Mercer coal facilities will meet the rules requirements. It will not be necessary to install any material controls at Powers other New Jersey facilities. Additional controls may be necessary at Powers Bridgeport Harbor coal-fired unit at an estimated cost of approximately $5 million. In December 2011, a decision was reached to upgrade the previously planned two flue gas desulfurization scrubbers and install Selective Catalytic Reduction (SCR) systems at Powers jointly owned coal fired generating facility at Conemaugh in Pennsylvania. This installation is expected to be completed in the first quarter of 2015. PSEGs share of this investment is approximately $147 million. New Jersey regulations required coal fired electric generating units to meet certain emissions limits or reduce mercury emissions by approximately 90% by December 15, 2007. Companies that are parties to multi-pollutant reduction agreements, such as Power, have been permitted to postpone such reductions on half of their coal fired electric generating capacity until December 15, 2012. With newly installed controls at its plants in New Jersey, Power has achieved the required mercury reductions that are part of Powers multi-pollutant reduction agreement that resolved issues arising out of the PSD/NSR air pollution control programs discussed above. Nitrogen Oxide (NOx) Regulation In April 2009, the NJDEP finalized revisions to NOx emission control regulations that impose new NOx emission reduction requirements and limits for New Jersey fossil fuel fired electric generating units. The rule will have a significant impact on Powers generation fleet, as it imposes NOx emissions limits that will require significant capital investment for controls or the retirement of up to 102 combustion turbines (approximately 2,000 MW) and four older New Jersey steam electric generating units (approximately 400 MW) by May 30, 2015. Power is currently evaluating its compliance options and is unable to estimate the possible loss or range of loss related to this matter. Under current Connecticut regulations, Powers Bridgeport and New Haven facilities have been utilizing Discrete Emission Reduction Credits (DERCs) to comply with certain NOx emission limitations that were incorporated into the facilities operating permits. In 2010, Power negotiated new agreements with the State of Connecticut extending the continued use of DERCs for certain emission units and equipment until May 31, 2014. Cross-State Air Pollution Rule (CSAPR) In July 2011, the EPA issued the Cross-State Air Pollution Rule (CSAPR) that limits power plant emissions in 28 states that contribute to the ability of downwind states to attain and/or maintain current particulate matter and ozone emission standards. Emission reductions would have been governed by this rule beginning on January 1, 2012 for Sulfur Dioxide (SO2) and annual NOx and May 1, 2012 for Ozone season NOx.
32
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Certain states would have been required to make additional SO2 reductions in 2014. The EPA issued draft technical adjustments to the final CSAPR in October 2011. Technical revisions to the CSAPR were finalized on February 7, 2012. The EPA increased New Jerseys allocation of annual NOx and ozone season NOx allowances beyond what was proposed. The EPA also finalized the increase in New Jerseys allocation of SO2 allowances from the October proposal. The additional increases in NOx allocations are favorable to us, since both Power and New Jersey as a whole were projected to be short on NOx allowances (both ozone season and annual) under the original allocation scenario. On December 30, 2011, the United States Court of Appeals for the D.C. Circuit issued a ruling to stay CSAPR pending judicial review. Until a final decision is reached, the court has ordered that the Clean Air Interstate Rule (CAIR) requirements continue temporarily. PSEG has intervened in this litigation along with Calpine and Exelon in support of implementing CSAPR. Oral argument occurred on April 13, 2012. A final decision on the merits is expected in the summer of 2012. The continuation of CAIR affects our generating stations in Connecticut, New Jersey and New York. The purpose of CAIR is to improve Ozone and Fine Particulate (PM2.5) air quality within states that have not demonstrated achievement of the National Ambient Air Quality Standards (NAAQS). CAIR was implemented through a cap-and-trade program and to date the impact has not been material to us as the allowances allocated to our stations were sufficient. If 2012 operations are similar to those in the past three years, it is expected that the impact to operations from the temporary implementation of CAIR in 2012 will not be significant. PSEG continues to evaluate the impact of this rule on it due to many of the uncertainties that still exist regarding implementation. Power has made major capital investments over the past several years to lower the SO2 and NOx emissions of its fossil plants in the states affected by CSAPR (New Jersey, New York and Pennsylvania). Power does not foresee the need to make significant additional expenditures to its generation fleet to comply with the regulation. As such, Power believes this rule will not have a material impact to its capital investment program or units operations. Clean Water Act Permit Renewals Pursuant to the Federal Water Pollution Control Act (FWPCA), New Jersey Pollutant Discharge Elimination System (NJPDES) permits expire within five years of their effective date. In order to renew these permits, but allow a plant to continue to operate, an owner or operator must file a permit application no later than six months prior to expiration of the permit. One of the most significant NJPDES permits governing cooling water intake structures at Power is for Salem. In 2001, the NJDEP issued a renewed NJPDES permit for Salem, expiring in July 2006, allowing for the continued operation of Salem with its existing cooling water intake system. In February 2006, Power filed with the NJDEP a renewal application allowing Salem to continue operating under its existing NJPDES permit until a new permit is issued. Power prepared its renewal application in accordance with the FWPCA Section 316(b) and the 316(b) rules published in 2004. Those rules did not mandate the use of cooling towers at large existing generating plants. Rather, the rules provided alternatives for compliance with 316(b), including the use of restoration efforts to mitigate for the potential effects of cooling water intake structures, as well as the use of site-specific analysis to determine the best technology available for minimizing adverse impact based upon a cost-benefit test. Power has used restoration and/or a site-specific cost-benefit test in applications filed to renew the permits at its once-through cooled plants, including Salem, Hudson and Mercer. As a result of several legal challenges to the 2004 316(b) rule by certain northeast states, environmentalists and industry groups, the rule has been suspended and has been returned to the EPA to be consistent with a 2009 United States Supreme Court decision which concluded that the EPA could rely upon cost-benefit analysis in setting the national performance standards and in providing for cost-benefit variances from those standards as part of the Phase II regulations.
33
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
In late 2010, the EPA entered into a settlement agreement with environmental groups that established a schedule to develop a new 316(b) rule by July 27, 2012. In April 2011, the EPA published a new proposed rule which did not establish any particular technology as the best technology available (e.g. closed cycle cooling). Instead, the proposed rule established marine life mortality standards for existing cooling water intake structures with a design flow of more than two million gallons per day. Power reviewed the proposed rule, assessed the potential impact on its generating facilities and used this information to develop its comments to the EPA which were filed in August 2011. Although the EPA has recently stated that a revision of the proposed rule to include an alternative framework for compliance is currently being considered, if the rule were to be adopted as proposed, the impact would be material since the majority of Powers electric generating stations would be affected. On June 11, 2012, the EPA posted a Notice of Data Availability (NODA) requesting comment on a series of technical issues related to the impingement mortality proposed standards. On June 12, 2012, the EPA posted a second NODA outlining its plans to finalize a Willingness to Pay survey it initiated to develop non-use benefits data in support of the April 2011 rule proposal. PSEG and industry trade associations submitted comments on both NODAs in early July. In July 2012, the EPA and environmental groups agreed to delay the deadline for finalization of the Rule to June 27, 2013 to allow for more time to address public comments and analyze data submitted in response to the NODAs. Power is unable to predict the outcome of this proposed rulemaking, the final form that the proposed regulations may take and the effect, if any, that they may have on its future capital requirements, financial condition, results of operations or cash flows. The results of further proceedings on this matter could have a material impact on Powers ability to renew permits at its larger once-through cooled plants, including Salem, Hudson, Mercer, Bridgeport and possibly Sewaren and New Haven, without making significant upgrades to existing intake structures and cooling systems. The costs of those upgrades to one or more of Powers once-through cooled plants would be material, and would require economic review to determine whether to continue operations at these facilities. For example, in Powers application to renew its Salem permit, filed with the NJDEP in February 2006, the estimated costs for adding cooling towers for Salem were approximately $1 billion, of which Powers share would have been approximately $575 million. These cost estimates have not been updated. Currently, potential costs associated with any closed cycle cooling requirements are not included in Powers forecasted capital expenditures. In addition to the EPA rulemaking, several states, including California and New York, have begun setting policies that may require closed cycle cooling. It is unknown how these policies may ultimately impact the EPAs rulemaking. In January 2010, the NJDEP issued a draft NJPDES permit to another company which would require the installation of closed cycle cooling at that companys nuclear generating station located in New Jersey. In December 2010, the NJDEP and that company entered into an Administrative Consent Order (ACO) which would require the company to cease operations at the nuclear generating station no later than 2019. In the ACO, the NJDEP agreed that closed cycle cooling is not the best technology available for that facility and agreed to issue a new draft NJPDES permit for that facility without a requirement for construction of cooling towers or other closed cycle cooling facilities. The new draft NJPDES permit was issued by NJDEP on June 1, 2011. The permit was issued as final on December 21, 2011 incorporating the 316(b) requirements as defined in the ACO. In that permit, NJDEP defended its position that closed-cycle cooling was not the best technology available for that facility. Per that permit the facility will cease operations on December 31, 2019. Power cannot predict at this time the final outcome of the NJDEP decision and the impact, if any; such a decision would have on any of Powers once-through cooled generating stations. Power has received a preliminary draft of the Delaware River Basin Commission (DRBC) water discharge permit that would revise Mercer Generating Stations thermal discharge limits and require compliance within five years of approval. Power is reviewing the proposed revisions with NJDEP and DRBC staff. Power cannot at this time determine the final form of the permit that will be presented to the DRBC commissioners for approval and what, if any, impact this permit would have on Mercers operations.
34
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
New Generation and Development Nuclear Power has approved the expenditure of approximately $192 million for a steam path retrofit and related upgrades at its co-owned Peach Bottom Units 2 and 3. Unit 3 upgrades were completed on schedule in October 2011. Unit 2 upgrades are expected to result in an increase of Powers share of nominal capacity by approximately 14 MW in 2012. Total expenditures through June 30, 2012 were $127 million. Power has also approved the expenditure of $419 million for an extended power uprate of the Peach Bottom nuclear units. The uprate is expected to result in an increase in Powers share of nominal capacity by approximately 130 MW. The uprate is expected to be in service in 2015 for Unit 2 and 2016 for Unit 3. Total expenditures through June 30, 2012 were $44 million. Connecticut Power was selected by the Connecticut Public Utilities Regulatory Authority (PURA), formerly the Department of Public Utility Control, in a regulatory process to build 130 MW of gas fired peaking capacity. Final approval was received and construction began in the second quarter of 2011. The project was placed in service in June 2012. Powers total capitalized expenditures for these generating units, which are included in Property, Plant and Equipment on the Condensed Consolidated Balance Sheets of PSEG and Power, were approximately $149 million (not including the capitalized cost to finance during construction). PJM Interconnection L.L.C. (PJM) In June 2012, Power completed construction and placed in service new 267 MW gas fired peaking facilities at its Kearny site. Powers total capitalized expenditures for these generating units, which are included in Property, Plant and Equipment on the Condensed Consolidated Balance Sheets of PSEG and Power, were approximately $244 million. PSE&GSolar As part of the BPU-approved Solar 4 All Program, PSE&G is installing up to 40 MW of solar generation on existing utility poles within its service territory. PSE&G estimates the total cost of this project to be $262 million. Approximately 30 MW have been installed as of June 30, 2012. PSE&Gs cumulative investments for these solar units were approximately $215 million, with additional purchases to be made on a quarterly basis during the remaining two-year term of the purchase agreement, to the extent adequate space on poles is available. Another aspect of the Solar 4 All program is the installation of 40 MW of solar systems on land and buildings owned by PSE&G and third parties. PSE&G estimates the total cost of this phase of the program to be $194 million. Through June 30, 2012, 36 MW representing 20 projects had been placed into service with an investment of approximately $173 million. Energy HoldingsSolar In January 2012, Energy Holdings acquired a 25 MW solar project currently under construction in Arizona. Completion of this project is expected in 2012. Energy Holdings issued guarantees of up to $71.5 million for payment of obligations related to the construction of the project, of which $23 million was outstanding as of June 30, 2012. These guarantees will terminate upon successful completion of the project. The total investment for the project is expected to be approximately $75 million. Basic Generation Service (BGS) and Basic Gas Supply Service (BGSS) PSE&G obtains its electric supply requirements for customers who do not purchase electric supply from third party suppliers through the annual New Jersey BGS auctions. Pursuant to applicable BPU rules, PSE&G enters into the Supplier Master Agreement with the winners of these BGS auctions following the BPUs approval of
35
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
the auction results. PSE&G has entered into contracts with Power, as well as with other winning BGS suppliers, to purchase BGS for PSE&Gs load requirements. The winners of the auction (including Power) are responsible for fulfilling all the requirements of a PJM Load Serving Entity including the provision of capacity, energy, ancillary services, transmission and any other services required by PJM. BGS suppliers assume all volume risk and customer migration risk and must satisfy New Jerseys renewable portfolio standards. Power seeks to mitigate volatility in its results by contracting in advance for the sale of most of its anticipated electric output as well as its anticipated fuel needs. As part of its objective, Power has entered into contracts to directly supply PSE&G and other New Jersey electric distribution companies (EDCs) with a portion of their respective BGS requirements through the New Jersey BGS auction process, described above. PSE&G has contracted for its anticipated BGS-Fixed Price eligible load, as follows:
PSE&G has a full requirements contract with Power to meet the gas supply requirements of PSE&Gs gas customers. Power has entered into hedges for a portion of these anticipated BGSS obligations, as permitted by the BPU. The BPU permits PSE&G to recover the cost of gas hedging up to 115 billion cubic feet or 80% of its residential gas supply annual requirements through the BGSS tariff. For additional information, see Note 17. Related-Party Transactions. Current plans call for Power to hedge on behalf of PSE&G approximately 70 billion cubic feet or 50% of its residential gas supply annual requirements. Minimum Fuel Purchase Requirements Power has various long-term fuel purchase commitments for coal through 2014 to support its fossil generation stations and for supply of nuclear fuel for the Salem and Hope Creek nuclear generating stations and for firm transportation and storage capacity for natural gas. Powers strategy is to maintain certain levels of uranium and to make periodic purchases to support such levels. As such, the commitments referred to below may include estimated quantities to be purchased that deviate from contractual nominal quantities. Powers nuclear fuel commitments cover approximately 100% of its estimated uranium, enrichment and fabrication requirements through 2015 and a portion for 2016 at Salem, Hope Creek and Peach Bottom. Powers various multi-year contracts for firm transportation and storage capacity for natural gas are primarily used to meet its gas supply obligations to PSE&G. These purchase obligations are consistent with Powers strategy to enter into contracts for its fuel supply in comparable volumes to its sales contracts.
36
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
As of June 30, 2012, the total minimum purchase requirements included in these commitments were as follows:
Regulatory Proceedings Electric Discount and Energy Competition Act (Competition Act) In 2007, PSE&G and Transition Funding were served with a purported class action complaint (Complaint) in New Jersey Superior Court challenging the constitutional validity of certain stranded cost recovery provisions of the Competition Act, seeking injunctive relief against continued collection from PSE&Gs electric customers of the Transition Bond Charge (TBC) of Transition Funding, as well as recovery of TBC amounts previously collected. The Superior Court subsequently granted PSE&Gs motion to dismiss the Complaint, which dismissal was upheld by the Appellate Division. In July 2007, the same plaintiff also filed a petition with the BPU requesting review and adjustment to PSE&Gs recovery of the same stranded cost charges. In June 2010, the BPU granted PSE&Gs motion to dismiss, and the plaintiff/petitioner subsequently appealed this dismissal to the Appellate Division. In June 2012, the Appellate Division affirmed the BPUs decision, concluding that the BPU had correctly found that the plaintiffs claims failed as a matter of law. The petitioner has filed a Notice of Petition for Certification with the New Jersey Supreme Court. New Jersey Clean Energy Program In 2008, the BPU approved funding requirements for each New Jersey EDC applicable to its Renewable Energy and Energy Efficiency programs for the years 2009 to 2012. The aggregate funding amount is $1.2 billion for all years. PSE&Gs share is $705 million. PSE&G has recorded a current liability of $138 million as of June 30, 2012. The liability is reduced as normal payments are made. The liability has been recorded with an offsetting Regulatory Asset, since the costs associated with this program are expected to be recovered from PSE&G ratepayers through the Societal Benefits Charge (SBC). The BPU has started a new Comprehensive Resource Analysis proceeding to determine SBC funding for the years 2013-2016. The proceeding has no impact on current SBC assessments. Long-Term Capacity Agreement Pilot Program (LCAPP) In 2011, New Jersey enacted the LCAPP Act that resulted in the selection of three generators to build a total of approximately 2,000 MW of new combined-cycle generating facilities located in New Jersey. Each of the New Jersey EDCs, including PSE&G, was directed to execute a standard offer capacity agreement (SOCA) with the three selected generators, but did so under protest preserving their legal rights. The SOCA provides for the EDCs to guarantee specified annual capacity payments to the generators subject to the terms and conditions of the agreement. The BPU has publicly released these guaranteed capacity prices for two of the three generators. The remaining generator has challenged the release of its guaranteed capacity price in state court. Legal challenges to the BPUs implementation of the LCAPP Act were filed in New Jersey appellate
37
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
court and the challenge filed by the EDCs has been remanded back to the BPU for consideration of certain procedural issues. In addition, the LCAPP Act has been challenged on constitutional grounds in federal court, and this case is pending. In May 2012, two of the three generators cleared the RPM auction for the 2015/2016 delivery year in the aggregate notional amount of approximately 1,300 MW of installed capacity. SOCA payments are for a 15 year term, which are scheduled to commence for one of the generators in the 2015/2016 delivery year and for the other generator in the 2016/2017 delivery year. Under current accounting guidance, the estimated fair value of the SOCAs is recorded as a derivative asset or liability with an offsetting Regulatory Asset or Liability on PSE&Gs Condensed Consolidated Balance Sheets. See Note 11. Fair Value Measurements for additional information. Leveraged Lease Investments On January 31, 2012, PSEG entered into a specific matter closing agreement settling the dispute with the IRS over previously challenged leveraged lease transactions. This agreement settles the leasing dispute with finality for all tax periods in which PSEG realized tax deductions from these transactions. On January 31, 2012, PSEG also signed a Form 870-AD settlement agreement covering all audit issues for tax years 1997 through 2003. On March 26, 2012, PSEG executed a Form 870-AD settlement agreement covering all audit issues for tax years 2004 through 2006. These two agreements conclude ten years of audits for PSEG and the leasing issue for all tax years. For PSEG, the impact of these agreements is an increase in financial statement Income Tax Expense of approximately $175 million. In prior periods, PSEG had established financial statement tax liabilities for uncertain tax positions in the amount of $245 million with respect to these tax years. Accordingly, the settlement resulted in a net $70 million decrease in the Income Tax Expense of PSEG. Cash Impact For tax years 1997 through 2003, the tax and interest PSEG owes the IRS as a result of this settlement will be reduced by the $320 million PSEG has on deposit with the IRS for this matter. PSEG paid a net deficiency for these years of approximately $4 million during the second quarter 2012. Based upon the closing agreement and the Form 870-AD for tax years 2004 through 2006, PSEG owes the IRS approximately $620 million in tax and interest for tax years from 2004 through 2006. Based on the settlement of the leasing dispute, for tax years 2007 through 2010, the IRS owes PSEG approximately $676 million. It is possible that PSEG would have to pay $620 million over the next year to the IRS and file claims for refunds for $676 million which the IRS would process in the normal course; it could take several years for the IRS to process these claims. In addition to the above, PSEG will claim a tax deduction for the accrued deficiency interest associated with this settlement in 2012, which will give rise to a cash tax savings of approximately $100 million. Note 9. Changes in Capitalization The following capital transactions occurred in the first six months of 2012: Power
PSE&G
38
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Energy Holdings
Note 10. Financial Risk Management Activities The operations of PSEG, Power and PSE&G are exposed to market risks from changes in commodity prices, interest rates and equity prices that could affect their results of operations and financial condition. Exposure to these risks is managed through normal operating and financing activities and, when appropriate, through hedging transactions. Hedging transactions use derivative instruments to create a relationship in which changes to the value of the assets, liabilities or anticipated transactions exposed to market risks are expected to be offset by changes in the value of these derivative instruments. Commodity Prices The availability and price of energy commodities are subject to fluctuations due to weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market conditions, transmission availability and other events. Power uses physical and financial transactions in the wholesale energy markets to mitigate the effects of adverse movements in fuel and electricity prices. Derivative contracts that do not qualify for hedge accounting or normal purchases/normal sales treatment are marked to market (MTM) with changes in fair value recorded in the income statement. The fair value for the majority of these contracts is obtained from quoted market sources. Modeling techniques using assumptions reflective of current market rates, yield curves and forward prices are used to interpolate certain prices when no quoted market exists. Cash Flow Hedges Power uses forward sale and purchase contracts, swaps and futures contracts to hedge
These derivative transactions are designated and effective as cash flow hedges. During the second quarter of 2012, Power de-designated certain of its commodity derivative transactions that had previously qualified as cash flow hedges as they were deemed to no longer be highly effective as required by the relevant accounting guidance. As a result, subsequent to June 1, 2012, Power recognizes all gains and losses from changes in the fair value of these derivatives immediately in earnings rather than deferring any such amounts in Accumulated Other Comprehensive Income (Loss). The fair values of Powers de-designated hedges were frozen in Accumulated Other Comprehensive Income (Loss) as the original forecasted transaction is still expected to occur and are reclassified into earnings as the original derivative transactions settle.
39
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
As of June 30, 2012 and December 31, 2011, the fair value and the impact on Accumulated Other Comprehensive Income (Loss) associated with accounting hedge activity was as follows:
The expiration date of the longest-dated cash flow hedge at Power is in 2014. Powers after-tax unrealized gains on these derivatives that are expected to be reclassified to earnings during the next 12 months are $19 million. There was no ineffectiveness associated with qualifying hedges as of June 30, 2012. Trading Derivatives The primary purpose of Powers wholesale marketing operation is to optimize the value of the output of the generating facilities via various products and services available in the markets we serve. Historically, Power engaged in trading of electricity and energy-related products where such transactions were not associated with the output or fuel purchase requirements of its facilities. This trading consisted mostly of energy supply contracts where Power secured sales commitments with the intent to supply the energy services from purchases in the market rather than from its owned generation. Such trading activities were marked to market through the income statement and represented less than one percent of gross margin (revenues less energy costs) on an annual basis. Effective July 2011, Power anticipates that it will not enter into any more trading derivative contracts. Other Derivatives Power enters into additional contracts that are derivatives, but do not qualify for or are not designated as cash flow hedges. These transactions are intended to mitigate exposure to fluctuations in commodity prices and optimize the value of our expected generation. Trade types include financial options, futures, swaps, fuel purchases and forward purchases and sales of electricity. Changes in fair market value of these contracts are recorded in earnings. Interest Rates PSEG, Power and PSE&G are subject to the risk of fluctuating interest rates in the normal course of business. Exposure to this risk is managed by targeting a balanced debt maturity profile which limits refinancing in any given period or interest rate environment. In addition, we have used a mix of fixed and floating rate debt, interest rate swaps and interest rate lock agreements. Fair Value Hedges PSEG enters into fair value hedges to convert fixed-rate debt into variable-rate debt. As of June 30, 2012, PSEG had eight interest rate swaps outstanding totaling $1.1 billion. These swaps convert Powers $250 million of 5% Senior Notes due April 2014, Powers $300 million of 5.5% Senior Notes due December 2015, $300 million of Powers $303 million of 5.32% Senior Notes due September 2016 and Powers $250 million of 2.75% Senior Notes due September 2016 into variable-rate debt. These interest rate swaps are designated and effective as fair value hedges. The fair value changes of the interest rate swaps are fully offset by the changes in the fair value of the underlying debt. As of June 30, 2012 and December 31, 2011, the fair value of all the underlying hedges was $66 million and $62 million, respectively. Cash Flow Hedges PSEG uses interest rate swaps and other derivatives, which are designated and effective as cash flow hedges, to manage their exposure to the variability of cash flows, primarily related to variable-rate debt instruments. The Accumulated Other Comprehensive Income (Loss) (after tax) related to interest rate derivatives designated as cash flow hedges was $(2) million as of June 30, 2012 and December 31, 2011.
40
Table of ContentsNOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
Fair Values of Derivative Instruments The following are the fair values of derivative instruments on the Condensed Consolidated Balance Sheets:
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||